 |
 |
|
|
 |
 |
| |
|
| |
 |
| |
|
| |
Business Performance
Record |
|
List
|
Business
performance records |
| 1
|
Project
name
|
DC 12,000A(24V~48V)
50units
(ETL, CGL CAL, ECL, Bus-Bar Line works, Leflow
included) |
Work
scope |
¢Á Design
(CAD)
¢Á Bus-Bar & all the other materials
¢Á Installation |
| 2 |
Facility
name |
Copper Jacket
facility by water cooling system
(First time in korea) (DC 160,000A) |
Work
scope
|
¢Á Hot forging
& machining
¢Á Defects inspection
(Water pressure Test, RT,UT,PT Check Test) |
| 3 |
Project
name
|
Australia
S.M.C (Sun metal Co., zinc electrical analysis
Facility)
Pb anode plate
Main Bus-Bar and Special alloy Copper (Bus-Bar)
materials supply |
| 4 |
Project
name
|
POSTIN Electric
Tin plate Line plant (DC 8,000A , 15,000A) |
Work
scope
|
¢Á Design
¢Á Bus Bars and all other materials
¢Á Installation, Inspection |
|
|
|
| |
|
|
|
|
|
 |
 |